Location: Taierzhuang, Zaozhuang City, Shandong, China
Capacity: 50MWH
Highlight: The project adopts a comprehensive development model combining "agricultural light" and "fishing light" complementarity, making full use of photovoltaic panels to raise the free area under the bracket, planting crops or fisheries, and realizing the intensive and three-dimensional comprehensive utilization of solar energy and land. , Maximize the use of space resources and form a construction model of “power generation above, breeding below, scientific development, and comprehensive utilization”. While achieving green, high-yield, and high-efficiency, the clean energy of solar energy can be fully developed and utilized, which is conducive to the promotion of modern agriculture and new energy industries are developing simultaneously. Our ESS cooling provides a strong guarantee for the smooth operation of the battery system of this project.
Location: Yuhang, Hangzhou, China
Capacity: 4MWH
Highlight: As a new generation of power grid equipment, Xiba mobile energy storage power station is like a super-capacity "charger", charging as a load when power is low, and discharging as a power source when power is peak. At the same time, its function of large-scale storage and release of electricity can realize the flexible adjustment and precise control of electricity supply and demand, which plays an important role in building a "three types and two networks" and building a "smart city". Our ESS cooling provides a strong guarantee for the smooth operation of the battery system of this project.
Location: Kunshan, Jiangsu, China
Capacity: 110.88MWH
Highlight: At present, it is the grid-side electrochemical energy storage power station with the largest single capacity in the world. The overall design technology of the power station is leading, the equipment has high technology content, and the performance is excellent. A number of high-end technologies fill the gaps on the domestic grid side. This project all adopts our ESS cooling.
Location: near Mendy Town, Wiltshire, England
Capacity: 99.8MWH
Highlight: As the largest BESS project in Europe, it provided emergency support power in the event of an accident on the main grid after completion, effectively improving the security level of the power grid in the southwest of the UK, providing support for the reform of the UK’s energy structure, and also for the world's joint response to climate change with a strong reference. Our ESS cooling provides a strong guarantee for the smooth operation of the battery system of this project.